Abuloma Woji Bridge
Abuloma Woji Bridge
Africa
Construction & infrastructure
Completed
Bridge and Access Ramps Connecting Two Villages
The bridge and its access ramps were part of a design-and-build project. For their construction, steel pipes were driven into the riverbed, followed by the casting of concrete piles and columns. A total of 63 pre-stressed beams were cast at an on-site field plant and lifted into place using a crane barge.